Wire length estimator

Metres and bundles of each wire size for the whole house, from a count of points.

Wire length estimator (taar kitni khareedni hai)

Count the points in the whole house and get an estimate in metres and 90 m bundles for each wire size used in Pakistan. For a room-by-room count use the house planner.

Common questions

Which wire size for what?

3/29 (≈1.5 mm²) for lights and fans; 7/29 (≈2.5 mm²) for sockets and kitchen points; 7/36 (≈4 mm²) for a 1–1.5 ton AC or water heater on its own breaker; 7/44 (≈6 mm²) for a 2 ton AC, motor or a sub-main to a floor DB; 7/52 (≈10 mm²) from the meter to the main DB. The final sizes should match the load and breaker chosen by your electrician.

How many metres in a bundle?

Wire in Pakistan is sold in coils of 90 metres (a gattha). The estimator rounds each size up to whole bundles.

Why pure copper?

Cheap wire sold as copper is often copper-coated aluminium or under-sized strands; it heats up under an AC load and is the commonest cause of house fires. Scrape a strand — it should be copper all the way through — and buy from a known mill.

More free tools

  • House builderDraw your rooms on your plot, drag things into place, then tap anything to see the tiles, paint, cement and wire it needs.
  • Society legal statusSearch any housing society in Islamabad or Rawalpindi and see whether it is approved, NOC in process, or illegal, with the approved area.
  • Plot priceBuying or selling? Pick the society and plot size for an estimated price range and the FBR reference value.
  • Cost by plot sizePick the area, plot size and dimensions; get cement bags, steel kg, bricks, labour, grey-structure and finishing cost.
  • TilesRooms in, tiles and boxes out, with wastage, bedding mortar and cost.
  • PaintLitres, gallons and drums for walls and ceilings, with primer and putty.
  • Daily cement mixBags and rehri of sand for today's plaster, brickwork or tile bedding, batch by batch.
  • Bricks & blocksBricks, concrete blocks or AAC blocks for a wall, with mortar or adhesive.
  • Concrete & steelCement, sand and crush for a slab, beam or lintel, and steel counted from the drawing.
  • Cost estimateA grey-structure and finishing budget for your covered area at the rates you are quoted today.
  • ChecklistFourteen stages: what to buy, what to check with the mistri, and what to photograph before it is covered.

Want a builder to check the numbers?

Blackfire Real Estate & Builders builds on labour or contract rate in Islamabad and Rawalpindi and does one-off site checks for people building themselves.

0371-7581455

All quantities on this site are estimates for planning and buying. Site conditions, workmanship and brands change the real figures. Structural sizes and reinforcement must come from your approved drawings and engineer.