Paint calculator
Litres, gallons and drums for walls and ceilings, with primer and putty.

Paint calculator (paint kitna lagega)
Room sizes in, litres and gallons out, with primer and putty. Use the coverage printed on your own paint bucket for the most accurate figure; the default is typical for emulsion on plastered walls.
Common questions
How many square feet does a gallon of paint cover?
A 3.64 L gallon of emulsion covers roughly 400 sq ft in one coat and 200 sq ft in two coats on smooth plaster. Textured or rough-cast walls take up to twice as much, and the first coat on fresh putty always drinks more.
Do I need primer and putty?
On new plaster, yes: two coats of putty give a smooth surface, and a coat of primer seals it so the paint does not soak in unevenly. Repainting a sound painted wall needs neither, just washing and a light sanding.
Gallon or drum?
A drum is four gallons (14.56 L) and is cheaper per litre. Buy drums for the main colour and gallons for accent walls and trims. Keep the batch numbers the same for one room.
When can I paint new plaster?
Wait 3–4 weeks after plastering so it dries through. Paint on damp plaster peels and shows salt patches within months.
More free tools
- House builderDraw your rooms on your plot, drag things into place, then tap anything to see the tiles, paint, cement and wire it needs.
- Society legal statusSearch any housing society in Islamabad or Rawalpindi and see whether it is approved, NOC in process, or illegal, with the approved area.
- Plot priceBuying or selling? Pick the society and plot size for an estimated price range and the FBR reference value.
- Cost by plot sizePick the area, plot size and dimensions; get cement bags, steel kg, bricks, labour, grey-structure and finishing cost.
- TilesRooms in, tiles and boxes out, with wastage, bedding mortar and cost.
- Daily cement mixBags and rehri of sand for today's plaster, brickwork or tile bedding, batch by batch.
- Bricks & blocksBricks, concrete blocks or AAC blocks for a wall, with mortar or adhesive.
- Concrete & steelCement, sand and crush for a slab, beam or lintel, and steel counted from the drawing.
- WiringMetres and 90 m bundles by wire size for the whole house.
- Cost estimateA grey-structure and finishing budget for your covered area at the rates you are quoted today.
- ChecklistFourteen stages: what to buy, what to check with the mistri, and what to photograph before it is covered.
Want a builder to check the numbers?
Blackfire Real Estate & Builders builds on labour or contract rate in Islamabad and Rawalpindi and does one-off site checks for people building themselves.
0371-7581455All quantities on this site are estimates for planning and buying. Site conditions, workmanship and brands change the real figures. Structural sizes and reinforcement must come from your approved drawings and engineer.